Foldable Tennis Ball Cart with Wheels – Portable Lightweight Holds 160 Balls Tenni Ball Hopper, Sports Teaching Cart Tennis Balls Basket with Removable Bag Side Pockets

★★★★★ 4.1 89 reviews

US$27.19
Price when purchased online
Free shipping Free 30-day returns

Sold and shipped by leungandgill.com
We aim to show you accurate product information. Manufacturers, suppliers and others provide what you see here.
US$27.19
Price when purchased online
Free shipping Free 30-day returns

How do you want your item?
You get 30 days free! Choose a plan at checkout.
Shipping
Arrives Sep 18
Free
Pickup
Check nearby
Delivery
Not available

Sold and shipped by leungandgill.com
Free 30-day returns Details

Product details

Management number 214606705 Release Date 2026/04/12 List Price US$27.19 Model Number 214606705
Category

Description:Large Capacity: This tennis cart with large capacity bag holds up to 160 tennis balls. It has two side pockets for cell phones, keys and other items. The double zipper design makes it easy to open the tennis cover.Detachable Design: The tennis cart comes with a removable ball bag that can be used with the frame or on its own. With the ball bag removed, the frame of this tennis cart folds down easily and is compact and tool-free.Durable Structure: Made of sturdy, rust-resistant aluminum tubing, the tennis ball hopper with wheels ensures 66 lbs. of weight capacity and durability. In addition, the basket is made of high-quality fabric that is abrasion and tear resistant.Lockable Wheels: Equipped with 4 universal wheels, this sports teaching cart allows you to move around with ease. In addition, 2 of the wheels are equipped with brakes to lock the cart in place.Wide Application: This multipurpose tennis ball hopper can hold and store a variety of balls, such as badminton, baseball, table tennis, pickleball, squash, etc. It will be a perfect gift for tennis or other ball sports lovers. Item Name: Tennis Ball Cart Material: Non-woven FabricFeatures: with Wheels, Lightweight, Removable Bag Size Details:L: 90cm/35.43", W: 40.5cm/15.94", H: 40.5cm/15.94" (Approx.)Notes:Due to the light and screen setting difference, the item's color may be slightly different from the pictures.Please allow slight dimension difference due to different manual measurement.Package Includes:1 Set of Tennis Ball Cart

  • - Massive Capacity & Convenient Storage - This innovative tennis cart features an oversized main compartment that effortlessly holds up to 160 tennis balls, plus dual side pockets for quick access to phones, keys, or accessories. The double-zipper design ensures smooth opening/closing, making it ideal for tennis training equipment, pickleball practice sessions, or volleyball drills.
  • - Detachable & Foldable Design - Enjoy ultimate versatility with a removable ball bag that works attached to the frame or standalone. Once detached, the rust-proof aluminum frame folds compactly in seconds—no tools needed! Perfect as a portable pickleball caddy, tennis hopper, or baseball cart for storage on-the-go.
  • - Heavy-Duty Durability - Built for relentless use, our sports cart boasts reinforced aluminum tubing and wear-resistant fabric. Supporting 66 lbs, it withstands daily wear with rugged wheels for smooth mobility—essential for tennis ball hoppers, pickleball pickup tubes, and baseball baskets heavy duty training.
  • - Locking Wheels for Secure Mobility - Glide across courts or fields effortlessly with 4 universal wheels, including 2 locking casters to brake the cart securely in place. Whether used as a volleyball cart with wheels, tennis ball cart, or pickleball basket with wheels, transport is always stable and hassle-free.
  • - Multi-Sport Versatility & Gift-Ready - Store tennis balls, pickleballs, baseballs, badminton birdies, and more in this all-in-one ball hopper. A must-have for coaches and players across sports like pickleball training, baseball practice, or volleyball—making it the ultimate gift for any sports enthusiast!
Size 1 Set
Color black
Material Non-woven Fabric
Brand Name HEVIRGO
Model Name Tennis Ball Cart
Part Number 69819698192FBE7DBD
Manufacturer Yaoxianliang
Package Weight 9.02 Pounds
Suggested Users unisex-adult
Included Components 1 Set of Tennis Ball Cart
Warranty Description 2
Item Dimensions LxWxH 35.43 x 15.94 x 15.94 inches
Item Package Dimensions L x W x H 36.42 x 6.69 x 5.91 inches

Correction of product information

If you notice any omissions or errors in the product information on this page, please use the correction request form below.

Correction Request Form

Customer ratings & reviews

4.1 out of 5
★★★★★
89 ratings | 36 reviews
How item rating is calculated
View all reviews
5 stars
77% (69)
4 stars
7% (6)
3 stars
4% (4)
2 stars
2% (2)
1 star
10% (9)
Sort by

There are currently no written reviews for this product.